Our team is experienced with all types of Testing procedures by MOI-SSD & QCD Qatar.
Factory Acceptance Test (FAT), is organized for each project where complexity and integration level require that all interconnections to be tested abroad. Site Acceptance test (SAT) is performed by our engineers for all systems before handed to the client. Unit Tests (UT) are performed for each item before installation.
We are keeping all project records like material delivery status (MIR), inventory list, commissioning reports, Work Inspection Reports (WIR), Datasheets & User manual Guides etc.
Before handing over any system to the client, the equipment will be powered up and tested by our technical team for a minimum period of one week.